New Albany, IN
Completed in 2023
The Main Street Revitalization project represents the final phase of a multi-year effort to enhance and modernize downtown New Albany’s historic corridor.
MAC Construction reconstructed the Main Street roadway and installed upgraded utility infrastructure, including a modern stormwater drainage system designed to address previously flood-prone areas. The project integrated civil improvements with pedestrian-focused streetscape enhancements to create a more functional and resilient urban environment.
Impact & Purpose
The completed corridor now supports continued private development while improving safety, accessibility, and long-term infrastructure performance.
- Final phase of a comprehensive downtown revitalization initiative
- Modernized aging infrastructure within a historic urban corridor
- Improved stormwater management in flood-prone areas
- Strengthened downtown as a walkable, mixed-use destination
Project Scope
The project required integration of underground utility work and surface-level aesthetic improvements within a constrained historic downtown setting.
- Full roadway reconstruction
- Installation of modern stormwater drainage systems
- Reconstruction of sidewalks and pedestrian access routes
- Ornamental streetscape features and seating areas
- Wayfinding signage and landscaping
- Decorative and pedestrian lighting installations
Technical Complexity
Construction occurred within an active downtown corridor with continuous business operations and pedestrian traffic. The project was completed safely and delivered a resilient infrastructure foundation supporting long-term downtown growth.
Key complexities included:
- Utility upgrades in a historically developed urban environment
- Stormwater improvements in known flood-prone conditions
- Maintenance of business access and pedestrian safety throughout construction
- Sequenced streetscape installation integrated with roadway reconstruction
- Coordination with municipal stakeholders and adjacent property owners