Monon South Trail – Phase 1A

Aerial view of a small town with a tree-lined road running through residential neighborhoods and surrounding green fields.

Southern Indiana (7 Cities)

Completed in 2025

The Monon South Trail Phase 1A project delivered 20 miles of new multi-use trail across seven cities in Indiana, completing a significant portion of the planned 62-mile Monon South Greenway along the historic Monon Railroad corridor.

Constructed between July 2024 and May 2025, the project transformed a former rail corridor into a modern, ADA-compliant recreational and transportation asset serving multiple counties and communities.

Impact & Purpose

The completed corridor now serves as a major recreational and transportation link connecting communities throughout Southern Indiana.

  • Constructed 20 miles of multi-use trail across seven municipalities
  • Advanced development of a 62-mile regional greenway system
  • Preserved historic transportation corridor while modernizing public access
  • Promoted connectivity, recreation, and community health
  • Strengthened regional collaboration across multiple jurisdictions

Project Scope

  • 20 miles of new multi-use trail construction
  • Development of six trailheads
  • Railbed stabilization and grading
  • Landscaping and site restoration
  • Bioswales and stormwater management systems
  • Permeable pavement installations
  • ADA-compliant trail alignment and structural features

Technical Complexity

The project required construction across remote, dispersed, and non-contiguous work zones with limited site access and variable environmental conditions. Despite geographic dispersion and condensed scheduling constraints, the project was delivered on schedule, with portions opened early to the public.

Key complexities included:

  • Logistical coordination across seven cities and multiple counties
  • Limited access points requiring specialized material delivery and staging
  • Seasonal paving restrictions resulting in an effective eight-month construction window
  • Stabilization of former railbed across varying soil conditions
  • Implementation of sustainable stormwater management systems
  • Sequencing of construction to allow early public access to completed segments

Performance & Safety

The Monon South Trail Phase 1A project demonstrates MAC Construction’s ability to manage large-scale, multi-jurisdictional infrastructure while maintaining disciplined safety standards and delivery performance.

  • On-schedule completion
  • Early opening of trail segments