Collaborative Project Delivery

Smarter Delivery. Stronger Outcomes. One Trusted Partner.

Every project is different, and so is the best way to deliver it. MAC Construction provides multiple alternative project delivery methods that offer owners greater flexibility, clearer communication, and more predictable results. By integrating design, engineering, and construction expertise early in the project, we streamline schedules, reduce change orders, and provide single-source accountability from concept through completion.

Whether you need a collaborative design team, a partner to share project risk, or a long-term operational solution, MAC delivers a model built around your goals, budget, and timeline.

Design-Build and Progressive Design-Build

Unified responsibility. Accelerated delivery. Fewer surprises.

In the Design-Build model, MAC serves as the single point of accountability for both design and construction. This integrated approach reduces risk, minimizes change orders, and allows project teams to work in alignment from day one. MAC also participates as a partner on design-build teams, bringing constructability review and estimating services in order to optimize project value.

Build-Operate-Transfer (BOT) & Public-Private Partnerships (P3)

Collaborative delivery from funding through long-term ownership.

MAC Construction works with public and private partners through Build-Operate-Transfer and other Public-Private Partnership models to help fund, design, construct, and deliver infrastructure efficiently.

Under a BOT structure, MAC may serve as a developer or project partner, collaborating with the owner throughout design, financing, construction, and temporary operation before transferring the completed asset back to the owner. Within a broader P3 framework, public agencies and private partners share responsibility, resources, innovation, and risk to move critical projects forward.

These collaborative delivery methods can help owners improve cost certainty, accelerate schedules, reduce risk, and access private-sector expertise and financing.

Benefits include:

Construction Management At-Risk (CMAR)

Early involvement with cost control and guaranteed maximum pricing.

Under the CMAR model, MAC joins the project during design, providing cost analysis, scheduling, constructability reviews, and value engineering. We then deliver construction services at a Guaranteed Maximum Price (GMP), giving owners financial transparency and cost assurance.

Benefits include:

Why Collaborative Delivery?

Every project faces unique challenges: budgets, timelines, regulations, site conditions, or operational demands. Alternative delivery methods provide owners with new ways to meet these challenges while improving project certainty, quality, cost and efficiency.

MAC’s strengths in alternate delivery models include: